- Comprehensive maintenance since 2012 at the Celldömölk, Pétfürdő, Vámosgyörk, DuFi
and Tifo sites
- 10-year periodic structural inspections of all fuel storage and unloading tanks
between 2016 and 2021
- Expansion of industrial railway at the Celldömölk site in 2018
- Site development of tank technology area at Celldömölk in 2018
- Scheduled replacement of measuring loops at the Celldömölk and Vámosgyörk sites
between 2016 and 2019
- Installation of VRU system and CH vapor pipeline at the Celldömölk site, 2017–2018
- Modernization of firewater system, including replacement of firewater pump drive motors
between 2021–2023
Major projects completed for MOL Plc.:
- Repair and replacement of approx. 400 meters of DN400 main pipeline at DuFi
site 206 storage area in 2021
- Repair and replacement of motor drives on technology pipelines connected to 80,000 m³ tanks
at DuFi and TiFo sites, from 2022 onward
- Installation of a digital camera surveillance system at DuFi site 206 storage area, 2023–2024
- Scheduled repair and replacement of parapet-mounted valve assemblies on 80,000 m³
tanks at DuFi and TiFo sites, 2020–2023References